London Tower Hire

Scaffold Tower Hire | West Wickham

DIY Scaffold Tower Hire West Wickham
We offer fibreglass/grp, aluminium, liftshaft scaffolding towers for hire. Offering platform towers in %location% and across Hertfordshire, London and Essex. Access towers, bridging decks & more, our range of towers and stagings are quick and easy to erect, reliable & compliant.
We provide many additional work stagings that are suited for quite specific tasks. These types of tools include low level stagings, self-propelled electrically powered platforms and a lot more.

Foldable Indoor Scaffolds
Scaffolding Tower you can gain access to lighting fixtures to change light bulbs or tidy up tall window cases in the great room. This particular Scaffolding Tower helps you to conveniently access hard to get to areas to put in acoustical or ceiling tiles, do electrical related job or complete HEATING AND AIR installment. Roll from 1 end of the area to the other, for painting, patching, wallpapering and hanging drywall with eight 5 in. swivel locking wheels. Which\’s a significant help whenever individuals don\’t have time to dismantle and build up the scaffolding. Home owners and professionals alike will appreciate the 250kg. load capacity. That means you could easily get 2 or even more big guys up there to help with drywall installation or painting. A big, 66.5 in. L x 16.25 in. W, wood and lightweight alloy deck provides a durable task surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe internal scaffold system, from the wheels to the guard rail. Use a singular or double deck, built upon the needs of the job. Whenever used as an individual story unit, the platform measures only 1m wide.

Cantilever Systems West Wickham
4.2 Metre (13ft 10in) Lightweight alloy access tower rental with 850mm cantilever frameworks to rise above obstacles at height. Twin width tower offering a platform area of 1.80 metre by 1.45 metre. The height of the tower specified is the platform height, a guardrail equipment on the platform will definitely make the tower 1 metre bigger. Offered along with adjustable securing wheels, protection toe-boards together with stabilisers when needed. Our scaffold towers come in numerous different varieties and designs, depending on precisely what is needed of them.
Span Access Platforms Basic safety
Standard hard hats and bump hats are required when proper protection against dropping objects and overhead obstructions is compulsory on the construction site. Safety Boots and shoes:
For basic foot protection, specified strengthened footwear developed to BSEN345 is advised. Safety Gloves:
A range of gauntlets, PVC, cotton and rigger gloves strongly recommended to provide essential hand protection

West Wickham Stairs aluminium Towers
For an one person tower, the MiTower performs it\’s purpose very well by providing access in limited areas by having one individual being required to assemble or take apart the tower. If a much larger tower is required, the MiTower Plus is readily available in a similar format but for two persons instead (due to its much larger size).
Lift Shaft Towers West Wickham
Staging Level (m) Max. Safe Working Level (m) Tower Size (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the lighter commercial mobile access tower system, developed for use in cramped places. The 61420400 confined space tower systems have a compact base measurement 0.7 m wide and 4m platform height. Featuring Lift Shaft/ confined space stabiliser for maximum stability (available for platform heights from 4m to 20m).
700mm width and 1.3 m length for confined spaces 250mm rung frames for quite easy climbing Walkthrough portal frames for full access at the bottom of the tower SP4 stabilisers for limited space Regular frame heights 2m, 1.5 m and 1m.
Where room is cramped, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, could solve your access problems. This narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to West Wickham are for Handrail level. Add 1m for working height. Where space is restricted, our 0.85 m slim width alloy towers can eliminate your access troubles.
Could we make it much higher by adding extra components?
Yes indeed don’t worry. Just explain exactly what you require and we\’ll ensure sure you get the equipment you need to reach the right working platform height.
Is the level adjustable?
Yes indeed it is. Add extra or less components to your requirements. The platform can be placed anywhere on the scaffold so as to give you the working height needed.
%video%
https://en.wikipedia.org/wiki/Scaffolding

https://londontowerhire.co.uk