London Tower Hire

Scaffold Tower Hire | Upper Clapton

DIY Scaffold Tower Hire Upper Clapton
We supply fibreglass/grp, aluminium, liftshaft scaffolding towers for hire. Offering scaffold towers in %location% and all over Hertfordshire, London city and Essex. Access towers, connecting decks & even more, our range of towers and platforms are quick and easy to set up, secure & compliant.
Our firm offers many additional work stagings that are suited for quite specific tasks. These tools include low level stagings, self-propelled electrically powered platforms and many more.

Foldable Interior Scaffolds
Scaffold Tower you can gain access to lighting fixtures to swap light bulbs or wash high home windows in the great room. This Platform Tower allows you to quickly access tough to reach places to put in acoustical or ceiling tiles, carry out electric task or complete COOLING AND HEATING setup. Roll from one end of the area to the other, for painting, patching, wallpapering and putting up drywall with eight 5 in. rotatiing lock casters. That\’s a significant help when individuals don\’t have time to take down and reconstruct the scaffold. Individuals and professionals alike will appreciate the 250kg. load capacity. That means anyone could effortlessly get two or more big guys up there in order to help with plaster board setup or painting. A big, 66.5 in. L x 16.25 in. W, wood and lightweight alloy deck offers a strong work surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe internal scaffold unit, from the casters to the guard rail. Use a singular or double deck, based on the requirements of the job. When used as a single story system, the platform measures only 1m wide.

Cantilever Systems Upper Clapton
4.2 Metre (13ft 10in) Aluminium access tower rental with 850mm cantilever frames to get over obstructions at height. Dual width tower giving a staging space of 1.80 metre by 1.45 metre. The level of the tower specified is the platform level, a guardrail system on the platform will certainly make the tower 1 metre bigger. Provided along with flexible securing wheels, safety toe-boards and stabilisers when needed. Our scaffold towers can be found in numerous different varieties and styles, according to exactly what is required of them.
Span Access Platforms Safety measures
Regular hard hats and bump hats are needed where protection against falling items and overhanging obstructions is compulsory on the construction site. Safety Boots and shoes:
For basic toe protection, specific hardened boots developed to BSEN345 is recommended. Protective Gloves:
A wide array of gauntlets, PVC, natural cotton and rigger gloves suggested to provide essential hand safety

Upper Clapton Stairs Access Towers
For a just one man tower, the MiTower serves it\’s purpose very well by providing access in limited locations with just one person being involved to erect or dismantle the tower. If a larger tower is called for, the MiTower Plus is readily available in a very similar format but for 2 persons instead (due to its much larger size).
Lift Shaft Towers Upper Clapton
Staging Level (m) Max. Safe Working Level (m) Tower Width (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light in weight commercial modular access tower system, produced for use in confined spaces. The 61420400 confined space tower systems have a compact base measurement 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for best stability (available for platform heights from 4m to 20m).
700mm width and 1.3 m length for restricted spaces 250mm rung frames for quick and easy climbing Walkthrough portal frames for total access at the bottom of the tower SP4 stabilisers for restricted space Regular frame heights 2m, 1.5 m and 1m.
When room is reduced, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, can easily fix your access concerns. This narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Upper Clapton are for Handrail height. Add 1m for working level. Where room is restricted, our 0.85 m slim width alloy towers can deal with your access troubles.
Can we make it bigger by adding extra components?
Yes not a problem. Just say what you really need and we\’ll ensure positive you get the gear you need to reach the right working platform height.
Is the level adjustable?
Yes it is. Add in more or fewer components to your needs. The platform can be placed in any place on the scaffold in order to give you the working height required.
%video%
https://en.wikipedia.org/wiki/Scaffolding

https://londontowerhire.co.uk