London Tower Hire

Scaffold Tower Hire | Tolworth

DIY Scaffold Tower Hire Tolworth
We supply fibreglass/grp, aluminium, liftshaft scaffold towers for hire. Providing scaffold towers in %location% and throughout Hertfordshire, London city and Essex. Access towers, bridging decks & more, our range of towers and stagings are easy to erect, secure & certified.
We provide various other work platforms that are suited for very specific jobs. These tools include low level platforms, self-propelled electrically powered platforms and a lot more.

Foldable Interior Platforms
Scaffold Tower you can easily access lights to remove light bulbs or tidy up high windows in the great room. This particular Scaffold Tower helps you to easily access tough to reach areas to put in acoustical or ceiling tiles, perform electrical job or complete COOLING AND HEATING installment. Roll from one end of the room to the other, for paint work, patching, wallpapering and hanging drywall with eight 5 in. rotatiing locking wheels. Which\’s a big help when individuals don\’t have time to take down and rebuild the scaffolding. House owners and experts alike will appreciate the 250kg. payload capacity. That means anyone could effortlessly get 2 or more big guys up there to assist with plaster board setup or painting. A large, 66.5 in. L x 16.25 in. W, timber and alloy deck offers a durable work surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and secure internal scaffold unit, from the wheels to the guard rail. Use a single or twin deck, based upon the needs of the project. When used as an individual story unit, the scaffolding measures only one metre wide.

Cantilever Systems Tolworth
4.2 Metre (13ft 10in) Alloy access tower hire with 850mm cantilever frameworks to get over obstructions at height. Double width tower offering a platform area of 1.80 metre by 1.45 metre. The height of the tower specified is the platform level, a guardrail equipment on the platform will make the tower 1 metre bigger. Provided along with adjustable securing castors, safety toe-boards together with stabilisers when required. Our scaffolding towers come in various different types and styles, depending on precisely what is needed of them.
Span Access Platforms Health and safety
Regular helmets and bump hats are needed where protection against dropping objects and overhanging obstructions is obligatory on site. Safety Boots:
For important toe protection, specified reinforced boots made to BSEN345 is recommended. Safety Gloves:
A wide array of gauntlets, PVC, pure cotton and rigger gloves recommended to provide essential hand coverage

Tolworth Staircase alloy Towers
For an one person tower, the MiTower serves it\’s objective extremely well by providing access in restricted locations by having one professional being needed to erect or take apart the tower. If a larger tower is required, the MiTower Plus is available in a very similar format but for two persons instead (due to its greater size).
Lift Shaft Towers Tolworth
Platform Level (m) Max. Safe Working Height (m) Tower Width (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light-weight construction modular access tower unit, constructed for use in cramped places. The 61420400 confined space tower systems have a compact base size 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for optimum stability (available for platform heights from 4m to 20m).
700mm width and 1.3 m length for confined spaces 250mm rung frames for simple climbing Walkthrough portal frames for full access below the tower SP4 stabilisers for limited space Normal frame heights 2m, 1.5 m and 1m.
When room is reduced, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, could solve your access issues. This particular narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Tolworth are for Handrail height. Add 1m for working height. Where space is reduced, our 0.85 m slim width alloy towers can solve your access troubles.
Could we make it higher by adding more components?
Absolutely not a problem. Simply explain exactly what you really need and we\’ll make sure you get the equipment you need to reach the right working platform height.
Is the level adjustable?
Indeed it is. Add in extra or less components to your needs. The platform can be placed in any place on the scaffold to give you the working height needed.
%video%
https://en.wikipedia.org/wiki/Scaffolding

https://londontowerhire.co.uk