London Tower Hire

Scaffold Tower Hire | Mill Hill East

DIY Scaffold Tower Rent Mill Hill East
We offer fibreglass/grp, aluminium, liftshaft scaffold towers for hire. Offering scaffolding towers in %location% and across Hertfordshire, Greater london and Essex. Access towers, bridging decks & much more, our variety of towers and stagings are quick and easy to put up, safe & certified.
We provide several different work platforms that are suited for quite specific tasks. These kinds of tools feature low level platforms, self-propelled electrically powered platforms and much more.

Foldable Home Scaffolds
Scaffold Tower you can access lighting fixtures to swap light bulbs or clean up high house windows in the great room. This kind of Platform Tower helps you to easily access tricky to get to places to install acoustical or ceiling tiles, do electrical related task or complete HEATING AND AIR installment. Wheel from one end of the area into the other, for painting, patching, wallpapering and putting up plasterboard with eight 5 in. swivel lock casters. That\’s a significant help when you don\’t have time to dismantle and build up the platform. Property owners and contractors alike will value the 250kg. weight capacity. That means you could quickly get 2 or even more big men up there to help with drywall installation or painting. A substantial, 66.5 in. L x 16.25 in. W, hardwood and aluminium lightweight deck offers a sturdy job surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and secure interior scaffold system, from the casters to the guard rail. Work with a singular or twin deck, based upon the requirements of the project. When used as a single story unit, the platform measures only 1m wide.

Cantilever Systems Mill Hill East
4.2 Metre (13ft 10in) Aluminium access tower hire with 850mm cantilever frameworks to overcome obstacles at height. Twin width tower giving a platform space of 1.80 metre by 1.45 metre. The level of the tower specified is the platform level, a guardrail system on the platform will definitely make the tower 1 metre bigger. Provided along with adjustable locking wheels, safety toe-boards as well as stabilisers when required. Our scaffolding towers come in multiple different types and designs, depending on precisely what is required of them.
Span Access Systems Safety measures
Regular helmets and bump caps are required where proper protection against falling objects and overhead obstructions is obligatory on site. Safety Footwear:
For necessary foot protection, specified reinforced boots designed to BSEN345 is recommended. Protective Gloves:
A wide range of gauntlets, PVC, pure cotton and rigger gloves highly recommended to provide essential hand protection

Mill Hill East Stairs alloy Towers
For a 1 man tower, the MiTower performs it\’s purpose extremely well by offering access in restricted locations by having one individual being needed to erect or take apart the tower. If a much larger tower is required, the MiTower Plus is available in a very similar format but for two persons instead (due to its greater size).
Lift Shaft Towers Mill Hill East
Staging Height (m) Max. Safe Working Height (m) Tower Size (m) Max. Safe Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light in weight industrial modular access tower unit, developed for use in confined spaces. The 61420400 confined space tower systems have a compact base dimension 0.7 m wide and 4m platform height. Featuring Lift Shaft/ confined space stabiliser for maximum stability (available for platform heights from 4m to 20m).
700mm width and 1.3 m length for restricted spaces 250mm rung frames for straightforward climbing Walkthrough portal frames for full access at the bottom of the tower SP4 stabilisers for limited space Standard frame levels 2m, 1.5 m and 1m.
When space is reduced, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, are able to fix your access issues. This specific narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Mill Hill East are for Handrail height. Add 1m for working level. Where room is restricted, our 0.85 m narrow width alloy towers can solve your access situations.
Could we make it a lot higher by adding in extra components?
Yes don’t worry. Just explain exactly what you require and we\’ll ensure certain you get the gear you need to reach the right working platform height.
Is the level adjustable?
Certainly it is. Add extra or less components to your requirements. The platform could be placed anywhere on the scaffold to give you the working height required.
%video%
https://en.wikipedia.org/wiki/Scaffolding

https://londontowerhire.co.uk