London Tower Hire

Scaffold Tower Hire | Brick Lane

DIY Scaffold Tower Hire Brick Lane
We provide fibreglass/grp, aluminium, liftshaft scaffolding towers for rent. Supplying scaffolding towers in %location% and across Hertfordshire, London city and Essex. Access towers, bridging decks & even more, our wide range of towers and platforms are quick and easy to set up, safe & compliant.
Our firm offers various other work stagings that are suited for really specific projects. These types of tools feature low level stagings, self-propelled electric powered platforms and a lot more.

Foldable Indoor Scaffolds
Scaffolding Tower you can get to lighting fixtures to remove light bulbs or clean high house windows in the great room. This particular Scaffold Tower helps you to quickly access tough to get to places to put in acoustical or ceiling tiles, carry out electrical related work or complete COOLING AND HEATING setup. Wheel from 1 end of the area to the other, for paint work, patching, wallpapering and putting up drywall with eight 5 in. swivel locking casters. That\’s a huge help when individuals don\’t have time to dismantle and rebuild the scaffold. House owners and contractors alike will appreciate the 250kg. weight capacity. That means you could easily get two or even more big individuals up there to assist with drywall installation or painting. A huge, 66.5 in. L x 16.25 in. W, wood and alloy deck provides a durable work surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and secure indoor scaffold system, from the casters to the guard rail. Make use of a single or double deck, based upon the needs of the project. Whenever used as a singular story system, the platform measures only one metre wide.

Cantilever Systems Brick Lane
4.2 Metre (13ft 10in) Aluminium access tower rental with 850mm cantilever frames to overcome obstacles at height. Dual width tower providing a platform area of 1.80 metre by 1.45 metre. The height of the tower defined is the platform height, a guardrail system on the platform will make the tower 1 metre higher. Provided with adjustable securing castors, basic safety toe-boards and stabilisers when needed. Our scaffolding towers come in many different varieties and models, depending on precisely what is needed of them.
Span Access Systems Essential safety
Standard safety helmets and bump caps are mandated when protection against dropping items and overhanging obstructions is mandatory on site. Safety Boots:
For basic foot protection, specific hardened boots developed to BSEN345 is recommended. Safety Gloves:
A variety of gauntlets, PVC, natural cotton and rigger gloves highly recommended to provide essential hand safety

Brick Lane Staircase aluminium Towers
For a 1 man tower, the MiTower performs it\’s purpose extremely well by providing access in limited areas by having one professional being needed to erect or dismantle the tower. If a bigger tower is required, the MiTower Plus is available in a similar format but for two persons instead (due to its greater size).
Lift Shaft Towers Brick Lane
Platform Height (m) Max. Safe Working Level (m) Tower Size (m) Max. Safe Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light in weight professional modular access tower system, produced for use in confined spaces. The 61420400 confined space tower systems have a compact base measurement 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for optimum stability (available for platform heights from 4m to 20m).
700mm width and 1.3 m length for cramped spaces 250mm rung frames for easy climbing Walkthrough portal frames for full access below the tower SP4 stabilisers for confined space Normal frame heights 2m, 1.5 m and 1m.
Where room is reduced, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, can easily solve your access issues. This particular narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Brick Lane are for Handrail level. Add 1m for working height. Where space is reduced, our 0.85 m narrow width alloy towers can fix your access issues.
Can we make it a lot higher by adding in more components?
Yes indeed no problem. Simply explain what exactly you need and we\’ll ensure sure you get the equipment you need to reach the right working platform height.
Is the level adjustable?
Indeed it is. Add extra or fewer components to your requirements. The platform can be placed anywhere on the scaffold to give you the working height required.
%video%
https://en.wikipedia.org/wiki/Scaffolding

https://londontowerhire.co.uk