London Tower Hire

Scaffold tower | Access Hire | Poplar

DIY Scaffold Tower Rent Poplar

We offer fibreglass/grp, aluminium, liftshaft scaffold towers for rent. Supplying scaffold towers in Poplar and throughout Hertfordshire, London and Essex. Access towers, connecting decks & even more, our range of towers and stagings are quick and easy to set up, safe & certified.

Our firm offers numerous additional work stagings that are suited for really specific projects. These tools include low level stagings, self-propelled electrically powered platforms and a lot more.

Scaffold hire London

Foldable Indoor Scaffolds

Scaffold Tower you can access lights to change light bulbs or tidy high home windows in the great room. This kind of Scaffolding Tower enables you to easily access hard to reach areas to put in acoustical or ceiling tiles, perform electrical related work or complete AIR CONDITIONER setup. Roll from one end of the area to the other, for paint work, patching, wallpapering and putting up drywall with eight 5 in. rotatiing lock casters. Which’s a big help when individuals don’t have time to take down and build up the scaffold. Home owners and specialists alike will appreciate the 250kg. payload capacity. That means you could quickly get two or even more big men up there to help with plaster board replacement or painting. A substantial, 66.5 in. L x 16.25 in. W, timber and lightweight alloy deck provides a tough work surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe interior scaffold unit, from the casters to the guard rail. Work with a single or twin deck, based on the needs of the job. Whenever used as an individual story unit, the scaffold measures only one metre wide.

Scaffold hire London

Cantilever Systems Poplar

4.2 Metre (13ft 10in) Alloy access tower hire with 850mm cantilever frameworks to overcome obstructions at height. Double width tower providing a staging area of 1.80 metre by 1.45 metre. The level of the tower defined is the platform level, a guardrail equipment on the platform will make the tower 1 metre bigger. Provided with adjustable locking castors, safety toe-boards as well as stabilisers where needed. Our scaffold towers come in several different types and styles, according to exactly what is needed of them.

Span Access Systems Essential safety

Standard safety helmets and bump caps are needed where proper protection against falling items and overhanging obstructions is obligatory on the construction site. Safety Footwear:

For essential toe protection, specific hardened footwear made to BSEN345 is advised. Protective Gloves:

A range of gauntlets, PVC, pure cotton and rigger gloves often recommended to provide essential hand coverage

Poplar Stairway Access Towers

For a 1 person tower, the MiTower performs it’s purpose extremely well by offering access in limited areas by having only one professional being involved to set up or dismantle the tower. If a larger tower is required, the MiTower Plus is readily available in a very similar format but for two persons instead (due to its bigger size).

Lift Shaft Towers Poplar

Platform Level (m) Max. Safe Working Level (m) Tower Size (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light-weight industrial modular access tower unit, produced for use in confined locations. The 61420400 confined space tower systems have a small base dimension 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for best stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for restricted spaces 250mm rung frames for effortless climbing Walkthrough portal frames for total access at the bottom of the tower SP4 stabilisers for restricted space Popular frame levels 2m, 1.5 m and 1m.

Where room is reduced, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, can certainly fix your access issues. This kind of narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Poplar are for Handrail level. Add 1m for working level. Where room is reduced, our 0.85 m narrow width alloy towers can eliminate your access situations.

Can we make it higher by adding in more components?

Yes indeed no problem. Just say what exactly you really need and we’ll make positive you get the equipment you need to reach the right working platform height.

Is the level adjustable?

Yes indeed it is. Add in more or fewer components to your needs. The platform can be placed anywhere on the scaffold in order to give you the working height needed.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | East Dulwich