London Tower Hire

Scaffold tower | Access Hire | Greenwich

DIY Scaffold Tower Rent Greenwich

We offer fibreglass/grp, aluminium, liftshaft scaffolding towers for hire. Providing scaffolding towers in Greenwich and all over Hertfordshire, London city and Essex. Access towers, connecting decks & much more, our wide range of towers and platforms are easy to erect, secure & compliant.

Our company provides several other work platforms that are suited for really specific projects. These types of tools include low level platforms, self-propelled electrical platforms and much more.

Scaffold hire London

Folding Interior Scaffolds

Scaffolding Tower you can get to lighting fixtures to change light bulbs or tidy up high house windows in the great room. This specific Scaffold Tower allows you to effortlessly access tricky to get to areas to put in acoustical or ceiling tiles, perform electrical related job or complete AIR CONDITIONER installment. Wheel from one end of the room into the other, for painting, patching, wallpapering and putting up drywall with eight 5 in. rotatiing locking wheels. That’s a big help when you don’t have time to take down and build up the scaffolding. Home owners and experts alike will value the 250kg. payload capacity. That means anyone could effortlessly get two or even more big men up there to assist with drywall installation or painting. A big, 66.5 in. L x 16.25 in. W, hardwood and aluminium lightweight deck offers a tough job surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe internal scaffold unit, from the wheels to the guard rail. Use a singular or twin deck, based on the needs of the project. Whenever used as an individual story unit, the scaffolding measures only 1m wide.

Scaffold hire London

Cantilever Systems Greenwich

4.2 Metre (13ft 10in) Aluminium access tower rental with 850mm cantilever frames to rise above obstacles at height. Double width tower providing a staging area of 1.80 metre by 1.45 metre. The level of the tower defined is the platform level, a guardrail system on the platform will make the tower 1 metre bigger. Offered with adjustable securing wheels, security toe-boards and stabilisers when needed. Our scaffolding towers come in various different varieties and designs, depending on precisely what is needed of them.

Span Access Platforms Health and safety

Standard safety helmets and bump hats are required when proper protection against falling items and overhanging obstructions is mandatory on site. Safety Boots:

For important toe protection, specific hardened footwear developed to BSEN345 is advised. Safety Gloves:

A range of gauntlets, PVC, natural cotton and rigger gloves strongly recommended to provide essential hand coverage

Greenwich Staircase alloy Towers

For an one man tower, the MiTower performs it’s purpose well by offering access in restricted locations with one person being required to set up or dismantle the tower. If a much larger tower is called for, the MiTower Plus is available in a similar format but for 2 persons instead (due to its wider size).

Lift Shaft Towers Greenwich

Staging Height (m) Max. Safe Working Height (m) Tower Size (m) Max. Safe Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light and portable professional modular access tower unit, designed for use in cramped places. The 61420400 confined space tower systems have a compact base measurement 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for best stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for cramped spaces 250mm rung frames for quite easy climbing Walkthrough portal frames for total access below the tower SP4 stabilisers for limited space Traditional frame levels 2m, 1.5 m and 1m.

When space is cramped, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, will be able to fix your access problems. This kind of narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Greenwich are for Handrail level. Add 1m for working level. Where space is reduced, our 0.85 m slim width alloy towers can solve your access troubles.

Could we make it a lot higher by adding more components?

Yes not a problem. Simply explain what you require and we’ll make certain you get the equipment you need to reach the right working platform height.

Is the level adjustable?

You bet it is. Add in more or fewer components to your needs. The platform can be placed in any place on the scaffold in order to give you the working height needed.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | Charing Cross