London Tower Hire

Scaffold tower | Access Hire | Golders Green

DIY Scaffold Tower Hire Golders Green

We supply fibreglass/grp, aluminium, liftshaft scaffold towers for rent. Providing scaffolding towers in Golders Green and throughout Hertfordshire, Greater london and Essex. Access towers, connecting decks & even more, our wide range of towers and stagings are very easy to set up, safe & certified.

Our company offer many other work stagings that are suited for really specific projects. These tools feature low level stagings, self-propelled electrically powered platforms and much more.

Scaffold hire London

Foldable Home Platforms

Scaffolding Tower you can easily access light fixtures to swap light bulbs or tidy tall window cases in the great room. This particular Platform Tower allows you to quite easily access difficult to reach areas to put in acoustical or ceiling tiles, perform electric task or complete HVAC setup. Wheel from one end of the area to the other, for painting, patching, wallpapering and putting up drywall with eight 5 in. rotatiing lock wheels. Which’s a significant help whenever you don’t have time to tear down and rebuild the scaffolding. House owners and specialists alike will appreciate the 250kg. weight capacity. That means you can effortlessly get 2 or even more big individuals up there to assist with plaster board setup or painting. A huge, 66.5 in. L x 16.25 in. W, wood and aluminium lightweight deck offers a tough task surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and secure interior scaffold system, from the wheels to the guard rail. Work with a singular or double deck, based on the needs of the project. When used as an individual story system, the scaffolding measures only 1m wide.

Scaffold hire London

Cantilever Systems Golders Green

4.2 Metre (13ft 10in) Lightweight alloy access tower rental with 850mm cantilever frames to get over obstacles at height. Twin width tower offering a platform area of 1.80 metre by 1.45 metre. The level of the tower specified is the platform level, a guardrail equipment on the platform will definitely make the tower 1 metre bigger. Provided along with flexible securing castors, protection toe-boards and stabilisers when needed. Our scaffolding towers can be found in several different varieties and styles, depending on exactly what is needed of them.

Span Access Platforms Safety

Standard helmets and bump caps are needed when proper protection against dropping items and overhanging obstructions is obligatory on the construction site. Safety Boots and shoes:

For important foot protection, specified strengthened boots made to BSEN345 is highly recommended. Safety Gloves:

A wide range of gauntlets, PVC, cotton and rigger gloves often recommended to provide essential hand protection

Golders Green Stairs Access Towers

For a just one person tower, the MiTower serves it’s purpose well by offering access in limited areas by having just one individual being needed to set up or take down the tower. If a much larger tower is called for, the MiTower Plus is available in a similar format but for 2 persons instead (due to its much larger size).

Lift Shaft Towers Golders Green

Platform Level (m) Max. Safe Working Level (m) Tower Size (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light and portable construction modular access tower system, produced for use in confined areas. The 61420400 confined space tower systems have a compact base measurement 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for highest stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for cramped spaces 250mm rung frames for quick and easy climbing Walkthrough portal frames for complete access at the bottom of the tower SP4 stabilisers for restricted space Traditional frame heights 2m, 1.5 m and 1m.

Where room is cramped, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, could fix your access issues. This specific narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Golders Green are for Handrail level. Add 1m for working level. Where room is reduced, our 0.85 m narrow width alloy towers can deal with your access issues.

Could we make it much higher by adding in more components?

Absolutely not a problem. Just say what you need and we’ll ensure positive you get the gear you need to reach the right working platform height.

Is the level adjustable?

Indeed it is. Add in more or less components to your needs. The platform can be placed in any place on the scaffold so as to give you the working height needed.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | Harlesden