London Tower Hire

Scaffold tower | Access Hire | Finchley

DIY Scaffold Tower Rent Finchley

We provide fibreglass/grp, aluminium, liftshaft scaffold towers for hire. Supplying scaffold towers in Finchley and all over Hertfordshire, The city of london and Essex. Access towers, bridging decks & even more, our variety of towers and stagings are easy to erect, safe & certified.

We offer numerous other work stagings that are suited for quite specific projects. These tools feature low level stagings, self-propelled electrically powered platforms and much more.

Scaffold hire London

Foldable Indoor Scaffolds

Scaffolding Tower you can get to fixtures to swap light bulbs or wash high home windows in the great room. This particular Platform Tower allows you to easily access difficult to reach places to install acoustical or ceiling tiles, perform electrical related work or complete AIR CONDITIONER installment. Wheel from one end of the area into the other, for paint work, patching, wallpapering and putting up drywall with eight 5 in. rotatiing lock wheels. Which’s a big help when individuals don’t have time to take down and reconstruct the scaffold. House owners and experts alike will appreciate the 250kg. payload capacity. That means anyone can effortlessly get 2 or even more big individuals up there in order to help with plaster board installation or painting. A large, 66.5 in. L x 16.25 in. W, wood and lightweight alloy deck offers a strong work surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe internal scaffold unit, from the wheels to the guard rail. Work with a single or twin deck, based on the needs of the job. When used as an individual story unit, the scaffold measures only one metre wide.

Scaffold hire London

Cantilever Systems Finchley

4.2 Metre (13ft 10in) Alloy access tower hire with 850mm cantilever frames to get over obstacles at height. Twin width tower giving a platform area of 1.80 metre by 1.45 metre. The height of the tower specified is the platform height, a guardrail equipment on the platform will certainly make the tower 1 metre higher. Supplied along with adjustable locking castors, safety toe-boards together with stabilisers where required. Our scaffolding towers come in many different varieties and styles, according to precisely what is required of them.

Span Access Platforms Essential safety

Regular safety helmets and bump caps are mandated where proper protection against dropping objects and overhead obstructions is mandatory on site. Safety Boots:

For basic foot protection, specific strengthened footwear designed to BSEN345 is highly recommended. Protective Gloves:

A variety of gauntlets, PVC, natural cotton and rigger gloves recommended to provide essential hand safety

Finchley Stairs alloy Towers

For a just one person tower, the MiTower performs it’s objective extremely well by offering access in restricted areas by having one professional being required to assemble or disassemble the tower. If a larger tower is required, the MiTower Plus is available in a very similar format but for 2 persons instead (due to its wider size).

Lift Shaft Towers Finchley

Staging Level (m) Max. Safe Working Level (m) Tower Size (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the lightweight industrial mobile access tower unit, designed for use in cramped places. The 61420400 confined space tower systems have a compact base size 0.7 m wide and 4m platform height. Featuring Lift Shaft/ confined space stabiliser for highest stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for cramped spaces 250mm rung frames for easy climbing Walkthrough portal frames for total access at the bottom of the tower SP4 stabilisers for limited space Normal frame levels 2m, 1.5 m and 1m.

Where room is restricted, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, can certainly solve your access concerns. The narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Finchley are for Handrail height. Add 1m for working height. Where room is reduced, our 0.85 m slim width alloy towers can deal with your access troubles.

Could we make it much higher by adding in extra components?

Absolutely no problem. Just say exactly what you require and we’ll ensure positive you get the gear you need to reach the right working platform height.

Is the height adjustable?

Indeed it is. Add extra or fewer components to your needs. The platform can be placed anywhere on the scaffold so give you the working height required.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | Charing Cross