London Tower Hire

Scaffold tower | Access Hire | City of London

DIY Scaffold Tower Hire City of London

We supply fibreglass/grp, aluminium, liftshaft scaffolding towers for rent. Offering scaffold towers in City of London and throughout Hertfordshire, The city of london and Essex. Access towers, bridging decks & even more, our range of towers and platforms are quick and easy to put up, safe & compliant.

We offer several additional work platforms that are suited for quite specific tasks. These tools feature low level platforms, self-propelled electrical platforms and a lot more.

Scaffold hire London

Folding Interior Platforms

Scaffold Tower you can easily access light fixtures to remove light bulbs or clean high house windows in the great room. This particular Platform Tower helps you to quite easily access difficult to reach areas to install acoustical or ceiling tiles, do electrical task or complete HVAC SYSTEM installation. Wheel from 1 end of the room to the other, for painting, patching, wallpapering and hanging drywall with eight 5 in. rotatiing locking casters. That’s a significant help whenever you don’t have time to tear down and rebuild the scaffold. Property owners and experts alike will value the 250kg. weight capacity. That means you could easily get 2 or more big guys up there in order to help with plaster board installation or painting. A huge, 66.5 in. L x 16.25 in. W, wood and aluminium lightweight deck offers a sturdy task surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe internal scaffold unit, from the casters to the guard rail. Work with a single or double deck, based upon the needs of the project. When used as an individual story unit, the scaffold measures only one metre wide.

Scaffold hire London

Cantilever Systems City of London

4.2 Metre (13ft 10in) Alloy access tower rental with 850mm cantilever frames to get over obstacles at height. Dual width tower providing a staging area of 1.80 metre by 1.45 metre. The level of the tower defined is the platform level, a guardrail equipment on the platform will definitely make the tower 1 metre bigger. Provided with adjustable locking wheels, protection toe-boards together with stabilisers when required. Our scaffold towers can be found in numerous different types and models, according to exactly what is required of them.

Span Access Systems Safety

Basic helmets and bump hats are mandated when protection against dropping items and overhead obstructions is mandatory on site. Safety Boots:

For basic foot protection, specific reinforced footwear designed to BSEN345 is highly recommended. Safety Gloves:

A variety of gauntlets, PVC, natural cotton and rigger gloves recommended to provide essential hand safety

City of London Stairs alloy Towers

For a 1 man tower, the MiTower serves it’s objective extremely well by providing access in restricted areas by having just one person being needed to erect or disassemble the tower. If a much larger tower is needed, the MiTower Plus is readily available in a similar format but for two persons instead (due to its larger size).

Lift Shaft Towers City of London

Platform Level (m) Max. Safe Working Level (m) Tower Width (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the light-weight commercial modular access tower unit, constructed for use in confined spaces. The 61420400 confined space tower systems have a compact base measurement 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for highest stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for restricted spaces 250mm rung frames for easy climbing Walkthrough portal frames for full access at the bottom of the tower SP4 stabilisers for confined space Traditional frame levels 2m, 1.5 m and 1m.

Where room is restricted, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, could fix your access problems. This narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to City of London are for Handrail level. Add 1m for working level. Where room is reduced, our 0.85 m slim width alloy towers can solve your access troubles.

Could we make it much higher by adding more components?

Yes no problem. Just explain what exactly you really need and we’ll make certain you get the gear you need to reach the right working platform height.

Is the level adjustable?

Certainly it is. Add in more or fewer components to your needs. The platform can be placed anywhere on the scaffold in order to give you the working height required.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | Cannon Street