London Tower Hire

Scaffold tower | Access Hire | Baker Street

DIY Scaffold Tower Hire Baker Street

We supply fibreglass/grp, aluminium, liftshaft scaffold towers for rent. Providing platform towers in Baker Street and throughout Hertfordshire, London city and Essex. Access towers, bridging decks & more, our range of towers and stagings are very simple to set up, reliable & compliant.

Our company offer various additional work stagings that are suited for really specific tasks. These types of tools include low level stagings, self-propelled electrical platforms and a lot more.

Scaffold hire London

Foldable Indoor Platforms

Scaffold Tower you can easily access fixtures to change light bulbs or clean tall house windows in the great room. This particular Scaffolding Tower enables you to effortlessly access difficult to reach places to install acoustical or ceiling tiles, carry out electrical related task or complete HEATING AND COOLING setup. Wheel from one end of the area to the other, for painting, patching, wallpapering and putting up drywall with eight 5 in. rotatiing lock casters. Which’s a significant help whenever individuals don’t have time to tear down and build up the platform. Property owners and experts alike will appreciate the 250kg. load capacity. That means you could quickly get two or even more big individuals up there to assist with drywall replacement or painting. A big, 66.5 in. L x 16.25 in. W, wood and lightweight alloy deck provides a strong task surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe indoor scaffold system, from the casters to the guard rail. Use a singular or double deck, based upon the needs of the project. Whenever used as an individual story system, the platform measures only 1m wide.

Scaffold hire London

Cantilever Systems Baker Street

4.2 Metre (13ft 10in) Aluminium lightweight access tower rental with 850mm cantilever frames to rise above obstructions at height. Double width tower offering a staging area of 1.80 metre by 1.45 metre. The level of the tower specified is the platform level, a guardrail equipment on the platform will definitely make the tower 1 metre higher. Offered along with flexible securing castors, security toe-boards together with stabilisers when required. Our scaffold towers can be found in multiple different types and styles, depending on precisely what is required of them.

Span Access Platforms Safety

Standard helmets and bump caps are needed when protection against falling items and overhead obstructions is mandatory on site. Safety Footwear:

For important toe protection, specified reinforced footwear developed to BSEN345 is highly recommended. Protective Gloves:

A variety of gauntlets, PVC, cotton and rigger gloves strongly recommended to provide essential hand safety

Baker Street Stairs alloy Towers

For a 1 person tower, the MiTower performs it’s purpose well by providing access in limited locations by having just one professional being required to set up or take down the tower. If a bigger tower is requested, the MiTower Plus is available in a similar format but for two persons instead (due to its greater size).

Lift Shaft Towers Baker Street

Staging Height (m) Max. Safe Working Height (m) Tower Size (m) Max. Secure Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the lightweight construction modular access tower system, constructed for use in confined areas. The 61420400 confined space tower systems have a small base size 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for highest stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for confined spaces 250mm rung frames for very easy climbing Walkthrough portal frames for complete access at the bottom of the tower SP4 stabilisers for restricted space Standard frame levels 2m, 1.5 m and 1m.

Where room is reduced, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, could fix your access problems. The narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Baker Street are for Handrail level. Add 1m for working level. Where room is restricted, our 0.85 m narrow width alloy towers can fix your access issues.

Could we make it much higher by adding in extra components?

Yes don’t worry. Just say what you really need and we’ll ensure sure you get the gear you need to reach the right working platform height.

Is the level adjustable?

Yes indeed it is. Add extra or fewer components to your needs. The platform could be placed anywhere on the scaffold to give you the working height required.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | Barbican