London Tower Hire

Scaffold tower | Access Hire | Millwall

DIY Scaffold Tower Hire Millwall

We offer fibreglass/grp, aluminium, liftshaft scaffolding towers for rent. Supplying scaffolding towers in Millwall and throughout Hertfordshire, London city and Essex. Access towers, bridging decks & even more, our variety of towers and platforms are quick and easy to set up, secure & certified.

Our company offer many different work platforms that are suited for very specific projects. These kinds of tools feature low level platforms, self-propelled electrical platforms and a lot more.

Scaffold hire London

Foldable Indoor Platforms

Scaffold Tower you can get access to fixtures to swap light bulbs or wash high windows in the great room. This specific Scaffolding Tower enables you to conveniently access tough to reach areas to put in acoustical or ceiling tiles, perform electrical related work or complete COOLING AND HEATING installation. Wheel from one end of the room into the other, for paint work, patching, wallpapering and hanging plasterboard with eight 5 in. swivel lock casters. Which’s a big help when individuals don’t have time to dismantle and rebuild the scaffolding. Home owners and experts alike will appreciate the 250kg. payload capacity. That means anyone could easily get two or even more big men up there in order to help with plaster board installation or painting. A large, 66.5 in. L x 16.25 in. W, timber and aluminium deck provides a tough work surface. The Youngman Two Story Rolling Scaffold Tower unit includes everything you need to build a safe and safe internal scaffold unit, from the casters to the guard rail. Work with a singular or double deck, based on the requirements of the task. Whenever used as a singular story unit, the scaffolding measures only one metre wide.

Scaffold hire London

Cantilever Systems Millwall

4.2 Metre (13ft 10in) Aluminium access tower rental with 850mm cantilever frameworks to rise above obstructions at height. Dual width tower offering a staging area of 1.80 metre by 1.45 metre. The level of the tower specified is the platform level, a guardrail system on the platform will certainly make the tower 1 metre higher. Supplied along with adjustable securing castors, safety toe-boards as well as stabilisers where needed. Our scaffolding towers come in several different types and models, according to precisely what is needed of them.

Span Access Systems Basic safety

Basic hard hats and bump hats are required where protection against dropping objects and overhanging obstructions is mandatory on site. Safety Boots and shoes:

For essential foot protection, specific strengthened footwear made to BSEN345 is advised. Protective Gloves:

A wide array of gauntlets, PVC, natural cotton and rigger gloves highly recommended to provide essential hand coverage

Millwall Staircase Access Towers

For a just one person tower, the MiTower serves it’s objective very well by offering access in limited areas by having only one person being needed to put up or dismantle the tower. If a much larger tower is needed, the MiTower Plus is readily available in a very similar format but for 2 persons instead (due to its greater size).

Lift Shaft Towers Millwall

Platform Level (m) Max. Safe Working Level (m) Tower Size (m) Max. Safe Working Load per Platform (kg) BoSS Liftshaft 7004m6m0.7 m275kg BoSS Lift Shaft 700 is the lighter industrial mobile access tower unit, designed for use in confined locations. The 61420400 confined space tower systems have a compact base dimension 0.7 m wide and 4m platform level. Featuring Lift Shaft/ confined space stabiliser for optimum stability (available for platform heights from 4m to 20m).

700mm width and 1.3 m length for cramped spaces 250mm rung frames for quick climbing Walkthrough portal frames for complete access below the tower SP4 stabilisers for restricted space Basic frame levels 2m, 1.5 m and 1m.

Where space is cramped, our 6.2 m Handrail Narrow Tower, 1.8 m Deck, can certainly solve your access issues. This kind of narrow width scafford tower is ideal for hallways and side elevations. Prices quoted to Millwall are for Handrail level. Add 1m for working level. Where space is reduced, our 0.85 m narrow width alloy towers can solve your access troubles.

Can we make it a lot higher by adding extra components?

Absolutely no problem. Just explain what you require and we’ll ensure certain you get the equipment you need to reach the right working platform height.

Is the level adjustable?

Indeed it is. Add extra or fewer components to your requirements. The platform can be placed anywhere on the scaffold in order to give you the working height needed.

https://en.wikipedia.org/wiki/Scaffolding

Scaffold tower | Access Hire | Canary Wharf